| Dimensional Tolerance |
General mechanical prototype parts |
Approximately ±0.05 mm for standard CNC work; tighter tolerances may require special processes, tooling, and inspection |
Which tolerances are achievable for each material and feature? Are critical dimensions inspected and documented? |
Clear tolerance capability reduces redesign, assembly, and quality risks. |
| Typical Lead Time |
Fast design verification and functional testing |
About 3–10 working days for many simple prototypes, excluding complex finishing, special materials, and international shipping |
Does the quoted schedule include programming, inspection, surface treatment, and transit? |
A complete schedule helps teams coordinate testing, product reviews, and launch milestones. |
| Supported Materials |
Aluminum, steels, stainless steels, brass, copper, engineering plastics, and selected titanium grades |
Documented experience with the exact alloy or plastic grade specified in the drawing |
Can the supplier provide material certificates, lot traceability, and substitute-material approval? |
Material variation can affect strength, corrosion resistance, weight, cost, and regulatory compliance. |
| Machine Capability |
Milled, turned, drilled, threaded, and multi-face components |
Suitable 3-axis or 5-axis milling and CNC turning capacity matched to part geometry |
What are the machine work envelopes, axis configurations, spindle capabilities, and minimum feature limits? |
The right equipment can reduce setups, improve consistency, and lower machining time. |
| Surface Finish |
As-machined parts or finished prototypes for presentation and testing |
As-machined finish commonly around Ra 3.2 μm; finer finishes require additional machining or finishing operations |
Which finishing options are available, and how are appearance and roughness measured? |
Finish affects appearance, friction, sealing, corrosion protection, and customer acceptance. |
| Quality Inspection |
Verification of critical dimensions, threads, flatness, and visual condition |
Calibrated measuring tools, first-article inspection, and inspection reports for defined critical features |
Is coordinate-measuring-machine inspection available? Can inspection records accompany the shipment? |
Objective inspection data supports engineering approval and supplier accountability. |
| Design for Manufacturability |
Review of wall thickness, internal corners, deep cavities, threads, and tool access |
Engineering feedback before production, including tolerance and tooling-risk review |
Will the team identify machining risks and suggest geometry changes without altering design intent? |
Early technical feedback can prevent avoidable delays and unexpected charges. |
| Minimum Order Flexibility |
One-off parts, small batches, and iterative prototype revisions |
Ability to support quantities from 1 piece to small production batches without unnecessary tooling commitments |
Are there minimum order quantities, setup fees, or additional charges for design revisions? |
Flexible ordering suits product development, testing, and low-volume market validation. |
| Quotation Transparency |
Comparison of machining, material, finishing, inspection, packaging, and freight costs |
An itemized quotation with assumptions, validity period, lead time, and revision policy |
Are shipping, taxes, finishing, inspection, and packaging included or billed separately? |
Transparent pricing makes supplier comparisons more accurate and reduces invoice disputes. |
| International Shipping |
Delivery to engineering teams, laboratories, factories, or distribution centers worldwide |
Tracked express and economy options with export documentation and protective packaging |
Which Incoterms, carriers, tracking options, customs documents, and insurance arrangements are supported? |
Reliable logistics reduce customs delays, damage risk, and landed-cost uncertainty. |
| Confidentiality and IP Protection |
Protection of CAD files, drawings, prototypes, and technical specifications |
Signed confidentiality terms, controlled file access, and clear ownership of customer designs |
How are files stored, shared, retained, and deleted? Are subcontractors covered by the same obligations? |
Strong IP controls are essential when outsourcing design-sensitive development work. |
| Communication and Support |
Fast clarification of drawings, approvals, changes, and nonconformities |
A defined project contact, written technical communication, and documented change control |
What is the normal response time, and how are engineering changes approved and recorded? |
Responsive communication is especially important across time zones and languages. |